• Subscribe
Call Toll Free: 866.641.1999
info@milestoneimports.com

Installation

Step 1

1.The crew lays out the borders and begins the multi-colored fan pattern.

Step 2

2.Centering and leveling lines are critical to a proper installation.

Step 3

3.The crew carefully selects the correct-sized cube for placement in the pattern.


Step 4

4.Constant review of the pattern is necessary to ensure a consistent pattern.


Step 5

5.To add interest to the walkway, the crew modifies the pattern to an arc at the entrance.


Step 6

6.The crew packs the cubes with a dry sand and cement mixture to achieve a uniform level.

 

Step 5

7.Water is sprinkled over the stonework to bond the cubes, resulting in a beautiful, durable walkway.