1.The crew lays out the borders and begins the multi-colored fan pattern.
2.Centering and leveling lines are critical to a proper installation.
3.The crew carefully selects the correct-sized cube for placement in the pattern.
4.Constant review of the pattern is necessary to ensure a consistent pattern.
5.To add interest to the walkway, the crew modifies the pattern to an arc at the entrance.
6.The crew packs the cubes with a dry sand and cement mixture to achieve a uniform level.
7.Water is sprinkled over the stonework to bond the cubes, resulting in a beautiful, durable walkway.